Mohmand Administration Restores Chanda Dam for Water Management
Mohmand Restores Chanda Dam for Water Management

The District Administration of Mohmand has commenced the restoration and cleaning of the Chanda Rainwater Dam in Upper Mohmand, aiming to bolster local water management, environmental stewardship, and community resilience against climate-related risks. The initiative, directed by the Khyber Pakhtunkhwa government, is overseen by Deputy Commissioner Mohmand Mansoor Arshad.

Inauguration Ceremony and Key Attendees

The project was formally inaugurated at a ceremony attended by Assistant Commissioner Upper Mohmand Sikandar Afzal, Marble Association President Tahir Khan, Headquarters Tehsildar Siyar Ahmad, representatives of the marble industry, and other stakeholders.

Addressing Accumulated Waste and Capacity Issues

Assistant Commissioner Sikandar Afzal highlighted that the dam had gradually accumulated marble waste, sediment, and other debris, reducing its storage capacity and impeding natural water flow. He stressed the importance of rehabilitating water infrastructure in areas vulnerable to environmental degradation and extreme weather. “The restoration of local water bodies and drainage systems is essential for improving water management and reducing environmental pressures on surrounding communities,” Afzal stated.

Wide Pickt banner — collaborative shopping lists app for Telegram, phone mockup with grocery list

Scope of Clean-Up Operation

According to district officials, the clean-up involves removing accumulated waste from the reservoir, restoring water-flow channels, and implementing measures to prevent future disposal of industrial debris into natural waterways and flood drains. The administration is also collaborating with industrial stakeholders to promote responsible waste management and enhance environmental compliance within the marble sector, a key economic contributor.

Industry Support and Commitment

Marble Association President Tahir Khan reaffirmed the industry’s support, stating that marble factory owners will continue cooperating with the administration on environmental protection and sustainable resource management.

Immediate Actions and Expected Benefits

Following the inauguration, loaders and heavy machinery began debris removal. Authorities expect the project to improve water retention, restore drainage efficiency, and contribute to the long-term sustainability of local water resources.

Broader Environmental Context

Environmental specialists note that maintaining and rehabilitating small dams, rainwater reservoirs, and natural drainage networks are crucial adaptation measures in regions facing increasing water resource pressure. Such interventions enhance watershed management, reduce environmental degradation, and strengthen community capacity to cope with weather-related challenges.

Commitment to Sustainable Management

District officials describe the Chanda Dam restoration as part of a broader commitment to sustainable environmental management and protection of critical infrastructure, emphasizing coordinated action among government institutions, industry, and local communities to address emerging climate and environmental challenges.

Pickt after-article banner — collaborative shopping lists app with family illustration